We got the cage built this weekend. (All but the knee bar.) I actually did most of the welding while Paul got the tubes cut and bent. Not only am I not embarrassed about the quality of my welds, I'd actually trust my life to them. The weather was great for a change. This time of year Salt Lake has schizophrenia rather than weather.
Caged (4 Weeks To Fernley)
Posted
4/17/2011 06:05:00 PM
by
Larry
Previously Paul had finished getting the floor welded, we fixed up the roof, brake and fuel lines placed, drivers door mounted, and somewhere in between we raced the Sear Pointless.
We got the cage built this weekend. (All but the knee bar.) I actually did most of the welding while Paul got the tubes cut and bent. Not only am I not embarrassed about the quality of my welds, I'd actually trust my life to them. The weather was great for a change. This time of year Salt Lake has schizophrenia rather than weather.
We got the cage built this weekend. (All but the knee bar.) I actually did most of the welding while Paul got the tubes cut and bent. Not only am I not embarrassed about the quality of my welds, I'd actually trust my life to them. The weather was great for a change. This time of year Salt Lake has schizophrenia rather than weather.
Regarding:
MRolla,
Preparation
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment